If AeroBarrier is applied at rough-in or post-drywall, there is very minimal preparation required by the Builder. Vertical surfaces like walls, doors and windows require no covering. All designed openings, such as ducts, electrical and plumbing need to be plugged prior to sealing.
If AeroBarrier is applied at final stage, all finished horizontal surfaces need to be covered, we have a team that can prep / mask at an additional cost